The HighStone Allocation Sheets format offers a flexible configuration in the steps taken to take Allocations on the Labour / Plant Sheets system into the main system Cost Reporting. The validation is applied at three stages:
When the Allocation Sheet is 'Approved' - or signed off
Depending on the level of control selected the following checks may or may not be made on each Allocation Sheet [Notes give the current setting]:
Setting a Works Activity (from the Works Order)
If NO Activity on the WO - None set
If only ONE Activity on the WO - That entry is taken
If two or more Activities on the WO - Prompt is given to select required item
Where sheets are 'Imported' as much data as is given in the source Format is taken and applied and saved. No other validation is applied.
The Sheet Submission process is intended to Close a Sheet and put it forward for approval. Checks are applied and reported as Errors, or Warnings. A Sheet cannot be Submitted if there are 'Errors' - but 'Warnings' are allowed through: